Even for experienced DIY enthusiasts, laying out hardwood flooring can be a challenge. Laying hardwood flooring is different than installing ceramic tile, vinyl siding, or linoleum. The key to a properly laid hardwood floor is planning, preparation, tools, and techniques. For DIY hardwood flooring installation, lay-the-wall-dry technology with Lock& Fold technology are the easiest and fastest way to install a hardwood floor.

Flooring Installation

Properly planning for hardwood flooring installation starts with the selection of the proper location for the work. Selecting the right location is essential to avoid moisture-related problems and ensure the best installation with the least amount of work. In general, jobsites should be located where there is adequate ventilation, lots of light, and relative humidity (the relative humidity that is close to 100%.) In most climates hardwood flooring websites are ideal from January to May. Following this period, the perfect time to lay the first few boards is after the subfloor has finished drying.

After the subfloor has finished drying the work area must be clean and dry. Laying out the first few boards is more difficult when there are moisture or moldings in the area. Work with a drywall knife to carefully remove any moldings or insulation that may be needed to work around exposed joints. If this isn’t enough, then use finishing nails to fasten the first few boards together. Finish the installation with moldings and trim to finish out the perimeter.

Depending on the type of hardwood and the area where it will be installed, there are different methods for applying the finishing coats. Allowing the wood to weather naturally produces the best results; however, if the moisture content is high and expansion is expected, applying a finish coat after the baseboard is in place will help protect the hardwood. Finishing coats are also available for MDF (medium-density fiberboard) and plywood.

After the hardwood floor is installed, it is necessary to prepare the subfloor for installation. This includes cleaning and smoothing the subsoil, which consists of boulders and burrs left behind by the installation. Then, remove all debris from the area. Then, mark the subfloor locations with masking tape, and staple down the subfloor as described in your manufacturer’s instructions. Lastly, apply the finishing coats as described above.

When flooring is properly installed, no gaps are created between the boards for water to enter the room. Also, the moisture will be trapped within the wood floor. If the flooring is installed over an existing surface, make sure that the sub-floor is level and clean before laying the hardwood. boards may need to be pitched to fit correctly. Oftentimes, extra support is needed when using floating floors. Click here for the #1 flooring company in Philadelphia for reliable hardwood installations.